South Africa
ocds-bidanga-ZA-SCM/TSW/05/2026-2027
Build 400 m paved road and stormwater drainage, Phahameng Bultfontein
Original title: MUNICIPAL DISASTER RESPONSE GRANT FOR CONSTRUCTION OF 400 m PAVED ROAD AND STORMWATER DRAINAGE (WARD 4) IN PHAHAMENG BULTFONTEIN.
Deadline
December 2, 2026
Key information
- Type
- Construction
- Location
- South Africa
- Deadline
- December 2, 2026 at 12:00 PM10 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Build 400 m paved road and stormwater drainage, Phahameng Bultfontein is a construction procurement opportunity published by Tswelopele Local Municipality in South Africa on November 18, 2026. Bids are open until December 2, 2026 (10 days left). 2 official documents are attached below.
MUNICIPAL DISASTER RESPONSE GRANT FOR CONSTRUCTION OF 400 m PAVED ROAD AND STORMWATER DRAINAGE (WARD 4) IN PHAHAMENG BULTFONTEIN. Special Conditions:
The tenders will be evaluated and adjudicated in line with the approved Supply Chain Management Policy of Tswelopele Local Municipality using 80/20 preference point system in accordance with the Preferential Procurement Policy Framework Act. The tenders will also be adjudicated and evaluated using: 1. Returnables. 2. Functionality 3. PPP Calculations = 80 4. Specified Goals = 20 (Race, Gender, Disability and Youth) Contact:
Name: MR TJ MATYESINI
Email: matyesin@gmail.com
Tel: 051-853-1111
What are the key dates?
Publication
November 18, 2026
Bid Submission Deadline
December 2, 2026
10 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Construction of 2 km paved road and drainage in Phahameng Bultfontein
· Construction
Review of roads and stormwater masterplan
· IT & Telecom
Road Construction and Stormwater Systems — Johannesburg
· Construction
Road resealing and stormwater maintenance in Kouga (3 years)
· Water & Sanitation
Upgrading of 3.1 km of CBD roads and stormwater drainage
· Water & Sanitation