Construction Works for Matanda Roller Compacted Concrete Dam in Kanungu District — Irrigation for Climate Resilience Project (ICRP)
Original title: Construction Works for Matanda Roller Compacted Concrete Dam in Kanungu District
Deadline
February 19, 2025
Key information
- Type
- Construction
- Location
- Uganda
- Deadline
- February 19, 2025 at 12:00 AMClosed
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Construction Works for Matanda Roller Compacted Concrete Dam in Kanungu District — Irrigation for Climate... is a construction procurement opportunity published by Ministry of Water and Environment in Uganda on December 19, 2024. Submissions closed on February 19, 2025. 1 official document is attached below.
REPUBLIC OF UGANDA MINISTRY OF WATER AND ENVIRONMENT Request for Bids Works (Two-envelope Bidding Process, Without Prequalification) IRRIGATION FOR CLIMATE RESILIENCE PROJECT (ICRP) PROJECT ID: P163836 CONSTRUCTION WORKS FOR MATANDA ROLLER COMPACTED CONCRETE DAM IN KANUNGU DISTRICT RFB NO: MWE/WRKS/24-25/00002 • The Republic of Uganda has received financing from the World Bank toward the cost of the Irrigation for Climate Resilience project (ICRP) and intends to apply part of the proceeds toward payments under the contract for Construction Works for Matanda Roller Compacted Concrete Dam in Kanungu District. • The Ministry of Water and Environment now invites sealed Bids from eligible Bidders for Construction Works for Matanda Roller Compacted Concrete Dam in Kanungu District. The Scope of Works comprises; (a) Dam works: The Scope of Works comprises drilling and grouting for dam foundation, construction of a 32m high Roller Compacted Dam (from dam foundation to crest), founded at 6m depth at lowest point within the rock. The dam shall have a 35m wide stepped spillway on the embankment. The spillway (Overflow) section of the dam will be 25.0m high from the foundation). The watertightness of the body of the dam is ensured by upstream watertightness using Grout-Enriched vibratable Roller-Compacted Concrete (GEVR) zone, thickness 1.5m for external concrete. The GEVR zone shall be produced by placing grout directly on the previously compacted RCC lift. Then loose RCC is placed over the grout and internal vibration is used to draw the grout up into the RCC to produce the water tight facing. There will be a 3-span precast C40 concrete bridge (supported over 2 concrete piers) over the spillway. The spillway shall have concrete flip bucket energy dissipator, discharging into a downstream channel. This downstream channel shall have 8m high reinforced concrete training walls. The bed for 35m length of the channel will be constructed with 1.5m thick Rip rap aggregates on 0.5m thick bed. Major bills of quantities include: 18,251m3 of earth excavation, 191,823m3 of rock excavation, 108,189m3 of RCC placement, 10,393m3 of vibrated concrete, class 25 – 30, for the spillway and intake gallery (b) Outlet Irrigation Pipe (about 100m): Other works shall include construction of a reinforced concrete inlet chamber (6m-wide by 6m high) and concrete gallery barrel for the irrigation pipes (2No). The construction shall entail installation of (2No.) 1.2m diameter pipes within the outlet barrel. One of pipe will be plugged with a stop valve and will be used to supply water under Phase 2 of the project. The other pipe will supply water for Phase 1 (4420Ha) of the command area.(c) Access roads: The Scope of Works comprises of opening up and construction of access road to the dam site and diversion of the 2.2Km community road. The existing community road will be submerged by the reservoir water at Full Reservoir Level. Both roads will be constructed as Grade A- marrum roads. Further details on the above works are provided in the bidding documents. The qualification requirements are detailed in Section III of the Bidding document. A margin of preference shall apply. 3. Bidding will be conducted through international competitive procurement using Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers- Procurement in Investment Projects Financing” July 2016, revised November 2017, July 2018 and November 2020 (“Procurement Regulations”), and is open to all eligible Bidders as defined in the Procurement Regulations. 4. Interested eligible Bidders may obtain further information from Head, Procurement and Disposal unit, Ministry of Water and Environment at mikhail.duncan@gmail.com with copies to iseganyi1988@gmail.com and gracerene.m@gmail.com and inspect the Bidding document during office hours from 9:00 a.m. to 5:00 p.m. on official working days (Monday-Friday) at the address given below in (11); 5. The Bidding document in English may be purchased by interested eligible Bidders upon the submission of a written application to the address below and upon payment of a non-refundable fee of UGX 600,000 (Uganda shillings: Six Hundred Thousand Only) or the equivalent in a freely convertible currency prior to submission date. The method of payment will be by Bank payment Advice Form obtained from Uganda Revenue Authority (URA) website using “other NTR” as a tax head in the form. The hard copy of the bidding documents in English will be available for pick up at the address mentioned in (11) and the soft copy can be accessed at https://www.mwe.go.ug/library/tendersprocurement. 6. (a) Pre-Bid site Visit conducted by the Employer shall take place at the following date, time and place; |
Date and time |
20th January, 2025 |
Venue & Contact |
Kanungu District Head Quarters Contact Person: Eng. Henry Kizito Email: kizitohl@yahoo.co.uk Contact: +256753224575 (b) Pre-Bid meeting will take place at the following date, time and place Date: 22nd January, 2025 Time: 11:00 a.m. Ugandan time Place: Ministry of Water and Environment Headquarters (Auditorium, Second Floor) 7. Bids must be delivered to the address below on or before 11:00 a.m. Ugandan time on 19th February, 2025. Electronic Bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked “ORIGINAL BID,” and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below in (11). All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening. 8. All Bids must be accompanied by a Bid Security of UGX 800,000,000 (Uganda Shillings: Eight Hundred Million Only) or the equivalent amount in any freely convertible currency. 9. All Bids must be accompanied by a Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH) Declaration. 10. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document. 11. The address referred to above is; Attn: Head, Procurement and Disposal Unit Ministry of Water and Environment Plot 3-7, Kabalega Crescent, Luzira P.O Box 20026 Luzira, Kampala PERMANENT SECRETARY MINISTRY OF WATER AND ENVIRONMENT
What are the key dates?
Publication
December 19, 2024
Bid Submission Deadline
February 19, 2025
Evaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
- Country
- Uganda
- Contact person
- Eng. Henry Kizito
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Supply of fuel and lubricants for mechanised road maintenance — Terego District Local Government
· Construction
Construction of OPD at Itia HC II-Phase III
· Construction
Construction of semi detached staff accomodation, kitchen and two stance VIP Latrine at Kaigo Primary School
· Construction
Construction of MWETA eco-tourism development infrastructure — Uganda
Uganda · Construction
Design and Construction of a 300m Boardwalk, Birdhides, Jetty Docking Area, Picnic Site and Eco Gates — National Forest Authority
Uganda · Construction