Morocco
ocds-bidanga-MA-MA-o8p-1041522
Control and Optimization of Technical Studies and Control of Reconstruction Works — Chief of the Mokhtar Souissi Dam Raising Project
Original title: CONTROLE ET OPTIMISATION DES ETUDES TECHNIQUES ET CONTROLE DES TRAVAUX DE RECONSTRUCTION DE DEUX UNITES SCOLAIRES MODULAIRES DES DOUARS TOUNKSIF ET TOUG EL KHIR ET D’UNE UNITE SCOLAIRE DEFINITIVE DU DOUAR TIGHZA ET DE CINQ ...
Deadline
October 14, 2026
This tender is closed
Submissions are no longer accepted. Similar opportunities are published every day:
Key information
- Type
- Construction
- Location
- Morocco
- Deadline
- October 14, 2026 at 11:00 AMClosed
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Control and Optimization of Technical Studies and Control of Reconstruction Works — Chief of the Mokhtar... is a construction procurement opportunity published by CHEF D'AMÉNAGEMENT DE LA SURELEVATION DU BARRAGE MOKHTAR SOUSSI in Morocco on September 21, 2026. Submissions closed on October 14, 2026.
Avis d'appel d'offres (Services) — marché public au Maroc. Acheteur public : CHEF D'AMÉNAGEMENT DE LA SURELEVATION DU BARRAGE MOKHTAR SOUSSI. Référence : 06/2026/ASBMS. Publié le 2026-09-21. Objet : CONTROLE ET OPTIMISATION DES ETUDES TECHNIQUES ET CONTROLE DES TRAVAUX DE RECONSTRUCTION DE DEUX UNITES SCOLAIRES MODULAIRES DES DOUARS TOUNKSIF ET TOUG EL KHIR ET D’UNE UNITE SCOLAIRE DEFINITIVE DU DOUAR TIGHZA ET DE CINQ...
What are the key dates?
Publication
September 21, 2026
Bid Submission Deadline
October 14, 2026
Evaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Similar tenders
Control and Quality Monitoring of Reconstruction Works of the Structural Facility — Provincial Director of Equipment, Transport, Logistics and Wate…
· Construction
Construction of the Sabaatou Rijal dam — Director of Hydraulic Developments
· Construction
Maintenance and repair works of administrative buildings at dams — Loukkos Basin Hydraulic Agency
· Water & Sanitation
Construction of the AOURIR dam — Director of Hydraulic Developments
· Construction
Quality Control and Monitoring of Reconstruction Works for a Structure at PK 47+450 — Provincial Directorate of Equipment, Transport and Logistics …
· Construction