Design and Installation of Carbon Online CEGRIT Sampler at Lethabo Power Station (2-year contract)
Original title: DESIGN AND INSTALLATION OF CARBON ONLINE CEGRIT SAMPLER AT LETHABO POWER STATION FOR A PERIOD OF TWO (02) YEARS.
Deadline
October 21, 2026
This tender is closed
Submissions are no longer accepted. Similar opportunities are published every day:
Key information
- Type
- Energy
- Location
- South Africa
- Deadline
- October 21, 2026 at 10:00 AMClosed
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Design and Installation of Carbon Online CEGRIT Sampler at Lethabo Power Station (2-year contract) is an energy procurement opportunity published by ESKOM in South Africa on September 21, 2026. Submissions closed on October 21, 2026. 4 official documents are attached below.
DESIGN AND INSTALLATION OF CARBON ONLINE CEGRIT SAMPLER AT LETHABO POWER STATION FOR A PERIOD OF TWO (02) YEARS. Special Conditions:
Tenders are to be submitted electronically via Eskom Etendering site by the stipulated closing date and time. Tenders are uploaded via Eskom Tender bulletin site on the Eskom Etendering page Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time Contact:
Name: Tlalane Motshabaesi
Email: motshatm@eskom.co.za
Tel: 016-457-5414
What are the key dates?
Publication
September 21, 2026
Bid Submission Deadline
October 21, 2026
Evaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
- Name
- ESKOM
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Supply and Installation of CO Gas Monitors for Coal Bunkers (Units 1-6) and SCADA Interface at Kriel Power Station — Eskom
· Energy
Supply and Installation of a Carbon, Hydrogen, Nitrogen, and Sulphur Analyser — Council for Geoscience
· Supplies
Supply and Installation of IT Equipment for the DECIM Project — Ministry of Energy and Hydrocarbons and Ministry of Digital Development
Madagascar · IT & Telecom
Acquisition of two vehicles — Carbon Market Regulation Authority in Kinshasa
· Supplies
Carbon Footprint and Environmental Assessment Study of the Information System — Moroccan Pension Fund
· Education