ocds-bidanga-RW-OP00363018
Design, Supply and Installation of low voltage and medium voltage lines in Rusizi District — ASCENT Project (World Bank)
Titre original : Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Rusizi district
Deadline
July 31, 2025
Key information
- Type
- IT & Télécom
- Deadline
- July 31, 2025 at 12:00 AMClosed
- Estimated Value
- Not disclosed
- Language of Notice
- English
Description
Specific Procurement Notice
Employer: Energy Development Corporation Limited (EDCL)
Project: Accelerating Sustainable and Clean Energy Transformation (ASCENT)
Funder: World Bank and Asia Infrastrusture Investment Bank
Contract title: Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Rusizi District
Procurement Method: National Competitive Bidding
Country: Rwanda
Credit No.: 7461 & 7460
RFP No: RW-REG/EDCL-425349-CW-RFP
Issued on: 11/06/2025
- The Government of Rwanda has received financing from the World Bank toward the cost of the Accelerating Sustainable and Clean Energy Transformation, and intends to apply part of the proceeds toward payments under the contract for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Rusizi District. “For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.”
- The Energy Development Corporation Limited (EDCL) now invites sealed Proposals from the interested eligible Applicants for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Rusizi District in Western Province of Rwanda (239.3 km from Kigali )
| Item | Description | Unit | Qty | Period |
|---|---|---|---|---|
| 1 | Wood Pole for LV and MV Lines construction | No | LV: 6300MV: 728 | 24 Months24 |
| 2 | Steel poles for MV Lines | No | 223 | 3 |
| Surge arrestors 30kV | set | 103 | 4 | 30kV MV underground cable CU, SWA, XLPE 1x50sqmm & 1x95sqmm |
| m | 1360 | 5 | ABC Twisted Cables | km |
| 331 | 6 | MV three phase ACSR conductor | km | 235 |
| 7 | 30/0.4kV Transformer-three phase from 25kVA to 400KVA | No | 68 | 8 |
| Service cables | km | 409.5• The procurement will be conducted through National Competitive procurement using Request for Proposals (RFP) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”) and is open to all eligible Proposers s as defined in the Procurement Regulations.• Interested eligible Proposers may obtain further information from Energy Development Corporation Limited (EDCL); [email protected] with a copy to [email protected] and [email protected] inspect the RFP document during office hours (09:00 AM to 5:00 PM) at the address given below.• The RFP Document in English may be purchased by initially selected eligible Proposers upon the submission of a written application to the address below and upon payment of a nonrefundable fee of of 50 USD or in a convertible currency. The method of payment will be deposit on the Bank Account N° 1000057734 in USD opened at National Bank of Rwanda in the name of EDCL EAQIP IDA Designated Account, Swift Code: BNRWRWRW. The document will be sent by e-mail.• A single-stage, where two envelope RFP process will be used, and the Proposal will consist of (i) the Technical Part, without any reference to prices; and (ii) the Finacial Part, as detailed in the RFP Document. The Technical and Financial Parts of the Proposals shall be submitted simultaneously in two separate sealed envelopes.• The Proposal, both the Technical Part and the Financial Part, must be delivered to the address below not later than 31/07/2025 at 10:30am (local time). Electronic Procurement will not be permitted. Late Proposals will be rejected. The Technical Part of the Proposals will be publicly opened in the presence of the Proposers’ designated representatives and anyone who chooses to attend at the address below on 31/07/2025 at 11:00am (local time). The Financial Part shall remain unopened and will be held in safe custody of the Employer until the second public opening of the Financial Part, following the evaluation of the Technical Part of the Proposals.• All Proposals must be accompanied by a “Proposal Security (bid security)” of 146,000 USD or in convertible currency.• The non-compulsory site visit is scheduled on 08/07/2025 and the meeting point is Rusizi District Office at 11:00 am.• The pre-bid meeting shall take place on the site at the end of site visit on the same day.• Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful Proposer’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the RFP document.• Please confirm receipt of this letter immediately in writing by electronic mail or fax. If you do not intend to submit Proposal, we would appreciate being so notified in writing at your earliest opportunity.• The address (es) referred to above is (are):Energy Development Corporation LtdFélix GAKUBA, Managing DirectorKN2 ST 3, Nyarugenge District, Kigali City,P.O. Box 3855 Kigali, Rwanda; Tel.: (250) 787172265,Kigali City Tower (KCT), 2nd Floor, Procurement OfficeWebsite: www.reg.rwSincerely. | Gentille UMUSHASHIHead Procurement Management Services | Félix GAKUBAManaging Director |
Tender Timeline
Publication
June 11, 2025
Bid Submission Deadline
July 31, 2025
Evaluation & Award
Pending
Contract Signature
Pending
Tender Documents
Connectez-vous pour télécharger le dossier et être averti automatiquement de toute modification de cet appel d'offres.