South Africa
ocds-bidanga-ZA-TNPA/2026/07/0002/114563/RFP
Design, Supply, Installation and Commissioning of an 11 kV Mini Substation, Perimeter and Entrance Lighting, and Security Fencing at Culemborg
Original title: DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF AN 11KV MINI SUBSTATION, PERIMETER AND ENTRANCE LIGHTING, AND SECURITY FENCING AT CULEMBORG FOR A PERIOD OF EIGHTEEN (18) MONTHS
Deadline
October 30, 2026
Key information
- Type
- Energy
- Location
- South Africa
- Deadline
- October 30, 2026 at 04:00 PM8 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Design, Supply, Installation and Commissioning of an 11 kV Mini Substation, Perimeter and Entrance Lighting... is an energy procurement opportunity published by Transnet National Ports Authority in South Africa on October 2, 2026. Bids are open until October 30, 2026 (8 days left). 4 official documents are attached below.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF AN 11KV MINI SUBSTATION, PERIMETER AND ENTRANCE LIGHTING, AND SECURITY FENCING AT CULEMBORG FOR A PERIOD OF EIGHTEEN (18) MONTHS Contact:
Name: Mcebo Mhlanga
Email: TNPATenderEnquiriesCPT@transnet.net
Tel: 021-449-5846
What are the key dates?
Publication
October 2, 2026
Bid Submission Deadline
October 30, 2026
8 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Supply and Installation of L13 Terraforce Retaining Wall and Security Fence with Security Lights for Southern Procurement Service Centre at Wynberg…
· Supplies
Supply, installation and testing of 132/275 kV substations — Unknown Entity
· IT & Telecom
Supply and installation of traction (3 kV DC) and distribution (11 kV & 6.6 kV AC) substations — Johannesburg
· Transport
Supply of Control and Instrumentation Cables for Grootvlei Power Station — Eskom
· Energy
Supply and Installation of MV Protection Equipment at Arnot Power Station — Eskom
· Energy