South Africa
ocds-bidanga-ZA-E3585GXMWP
Maintenance and supply of scaffolding and insulation materials for 14 fossil-fired power stations — Eskom
Original title: The maintenance, outage repair services; the supply, transportation, erection and dismantling of scaffolding and insulation material for boiler pressure parts and high pressure pipework for 14 (fourteen) fossil fired power stations for a period of 5 (five) years.
Deadline
November 11, 2026
Key information
- Type
- Energy
- Location
- South Africa
- Deadline
- November 11, 2026 at 10:00 AM19 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Maintenance and supply of scaffolding and insulation materials for 14 fossil-fired power stations — Eskom is an energy procurement opportunity published by ESKOM in South Africa on October 13, 2026. Bids are open until November 11, 2026 (19 days left). 6 official documents are attached below.
The maintenance, outage repair services; the supply, transportation, erection and dismantling of scaffolding and insulation material for boiler pressure parts and high pressure pipework for 14 (fourteen) fossil fired power stations for a period of 5 (five) years. Contact:
Name: Asanda Mzileni
Email: asanda.mzileni@eskom.co.za
Tel: 011-800-6131
What are the key dates?
Publication
October 13, 2026
Bid Submission Deadline
November 11, 2026
19 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
- Name
- ESKOM
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Supply of Electrical Spare Parts and Consumables for Kusile Power Station — Eskom
· Energy
Renovation, Repair and Maintenance Works of Building and Electrical Infrastructure in GroenKloof
· Construction
Mechanical maintenance of boiler auxiliary plant, soot blowers and valves — Eskom, Camden Power Station
· Energy
Refurbishment and upgrading of electrical protection systems and associated components — Eskom
· Consulting & Studies
Coal and Limestone Sampling at Kusile Power Station — Eskom
· Energy