Morocco
ocds-bidanga-MA-MA-o8p-1043017
Quality Control and Monitoring of Bridge Reconstruction Works on Oued Tasminaght (RN 9) — Zagora Provincial Equipment Directorate
Original title: Programme de réhabilitation des zones sinistrées par les inondations dans le Sud-Est du Royaume : Contrôle et suivi de la qualité des travaux de reconstruction d'un ouvrage d'art sur Oued Tasminaght au PK 554+700 de la RN 9 ...
Deadline
November 9, 2026
Key information
- Type
- Construction
- Location
- Morocco
- Deadline
- November 9, 2026 at 10:00 AM18 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Quality Control and Monitoring of Bridge Reconstruction Works on Oued Tasminaght (RN 9) — Zagora Provincial... is a construction procurement opportunity published by CHARGE DE LA DIRECTION PROVINCIALE D'EQUIPEMENT DE ZAGORA in Morocco on October 13, 2026. Bids are open until November 9, 2026 (18 days left).
Avis d'appel d'offres (Services) — marché public au Maroc. Acheteur public : CHARGE DE LA DIRECTION PROVINCIALE D'EQUIPEMENT DE ZAGORA. Référence : 38/2026/dpetdezagora. Publié le 2026-10-13. Objet : Programme de réhabilitation des zones sinistrées par les inondations dans le Sud-Est du Royaume : Contrôle et suivi de la qualité des travaux de reconstruction d'un ouvrage d'art sur Oued Tasminaght au PK 554+700 de la RN 9...
What are the key dates?
Publication
October 13, 2026
Bid Submission Deadline
November 9, 2026
18 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Similar tenders
Quality control and monitoring studies for the reconstruction works of the PK1148+600 bridge structure — Provincial Directorate of Equipment, Trans…
· Construction
Quality Control and Monitoring Services for the Reconstruction of a Structure over Oued Laabid — Provincial Directorate of Equipment of Azilal
· Construction
Control and Quality Monitoring of Reconstruction Works of the Structural Facility — Provincial Director of Equipment, Transport, Logistics and Wate…
· Construction
Quality Control and Monitoring of Reconstruction Works for a Structure at PK 931+500 on RN17 — Zagora Provincial Equipment Directorate
· Construction
Quality Control and Monitoring of Reconstruction Works for a Structure at PK 47+450 — Provincial Directorate of Equipment, Transport and Logistics …
· Construction