Morocco
ocds-bidanga-MA-MA-o8p-1040119
Study for the alignment correction of RN17 (PK 72+000 to PK 81+000) and construction of Guenfouda dam — Provincial Directorate of Equipment, Transp…
Original title: Etude pour la rectification du tracé de la RN17 du PK 72+000 au PK 81+000 Sur environ 11 km (Construction du barrage de Guenfouda). –Préfecture Oujda-Angad et Province de Jerada– ...
Deadline
October 8, 2026
This tender is closed
Submissions are no longer accepted. Similar opportunities are published every day:
Key information
- Type
- Construction
- Location
- Morocco
- Deadline
- October 8, 2026 at 11:00 AMClosed
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Study for the alignment correction of RN17 (PK 72+000 to PK 81+000) and construction of Guenfouda dam... is a construction procurement opportunity published by DIRECTION PROVINCIALE DE L'EQUIPEMENT, DU TRANSPORT ET DE LA LOGISTIQUE OUJDA ANGAD in Morocco on September 16, 2026. Submissions closed on October 8, 2026.
Avis d'appel d'offres (Services) — marché public au Maroc. Acheteur public : DIRECTION PROVINCIALE DE L'EQUIPEMENT, DU TRANSPORT ET DE LA LOGISTIQUE OUJDA ANGAD. Référence : 34/2026/OU. Publié le 2026-09-16.
Objet : Etude pour la rectification du tracé de la RN17 du PK 72+000 au PK 81+000 Sur environ 11 km (Construction du barrage de Guenfouda). –Préfecture Oujda-Angad et Province de Jerada–...
What are the key dates?
Publication
September 16, 2026
Bid Submission Deadline
October 8, 2026
Evaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Similar tenders
Topographic control of the widening and reinforcement works of RN 13 from PK 103+060 to PK121+710 over 18,65 km — Provincial Directorate of Equipme…
· Construction
Quality Control and Monitoring of Reconstruction Works for a Structure at PK 931+500 on RN17 — Zagora Provincial Equipment Directorate
· Construction
Upgrade works of RN1 (PK 604+466 to PK 610+510, 6.044 km) — Provincial Directorate of Equipment, Transport, Logistics and Water of Safi
· Construction
Maintenance works on RN17 (PK 169+920 to PK 247+421) — Provincial Director of Equipment in Figuig
· Construction
Coordinated maintenance works on RN1 (PK 1577+000 to PK 1849+000) — Provincial Directorate of Equipment, Transport, Logistics and Water of Boujdour
· Construction