Morocco
ocds-bidanga-MA-MA-o8p-1044351
Study for the construction of a bridge in Mechraa Bel Ksiri — Provincial Directorate of Equipment, Transport and Logistics of Sidi Kacem
Original title: Etude de construction d’un ouvrage d’art sur la voie de contournement reliant la RP4232 et la RN27 à l’intersection avec la voie ferrée au niveau de la ville de Mechraa Bel Ksiri lot unique-Province de Sidi Kacem- ...
Deadline
November 11, 2026
Key information
- Type
- Construction
- Location
- Morocco
- Deadline
- November 11, 2026 at 10:00 AM19 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Study for the construction of a bridge in Mechraa Bel Ksiri — Provincial Directorate of Equipment, Transport... is a construction procurement opportunity published by LE DIRECTEUR PROVINCIAL DE L'EQUIPEMENT ET DU TRANSPORT ET DE LA LOGISTIQUE DE SIDI KACEM in Morocco on October 5, 2026. Bids are open until November 11, 2026 (19 days left).
Avis d'appel d'offres (Services) — marché public au Maroc. Acheteur public : LE DIRECTEUR PROVINCIAL DE L'EQUIPEMENT ET DU TRANSPORT ET DE LA LOGISTIQUE DE SIDI KACEM. Référence : SK57/2026. Publié le 2026-10-05.
Objet : Etude de construction d’un ouvrage d’art sur la voie de contournement reliant la RP4232 et la RN27 à l’intersection avec la voie ferrée au niveau de la ville de Mechraa Bel Ksiri lot unique-Province de Sidi Kacem-...
What are the key dates?
Publication
October 5, 2026
Bid Submission Deadline
November 11, 2026
19 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Similar tenders
Maintenance and rehabilitation of the Oued R'dom bridge (PK 38+685, RP4252) — Provincial Directorate of Equipment and Transport of Sidi Kacem
· Construction
Study for the reconstruction of a bridge over Oued Bourdim (PK33+350, RP6005) — Taourirt Equipment and Transport Directorate
· Construction
Construction of a footbridge — Sidi Yahya Zaer Municipality
· Construction
Geotechnical study for the reconstruction of the Oued Sidi Moussa bridge — Taourirt Equipment and Transport Directorate
· Construction
Geotechnical Study of the Bypass Road at Mechra Belksiri — Provincial Director of Equipment, Transport and Logistics of Sidi Kacem
· Construction