South Africa
ocds-bidanga-ZA- SCMU10-26/27-0018
Construction of Gali River Bridge — E-Transport
Original title: CONSTRUCTION OF GALI RIVER BRIDGE
Deadline
November 2, 2026
Key information
- Type
- Construction
- Location
- South Africa
- Deadline
- November 2, 2026 at 11:00 AM10 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Construction of Gali River Bridge — E-Transport is a construction procurement opportunity published by Eastern Cape - Transport in South Africa on October 4, 2026. Bids are open until November 2, 2026 (10 days left). 6 official documents are attached below.
CONSTRUCTION OF GALI RIVER BRIDGE Contact:
Name: Ms A Bobo
Email: aviwe.bobo@ectransport.gov.za
Tel: 077-606-9087
What are the key dates?
Publication
October 4, 2026
Bid Submission Deadline
November 2, 2026
10 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Construction of the Tshikotoni Bridge Project
· Construction
Construction of Ganyesa Bridge and Access Road — Kgalagadi Municipality
· Construction
Study for the construction of a bridge in Mechraa Bel Ksiri — Provincial Directorate of Equipment, Transport and Logistics of Sidi Kacem
· Construction
Study for the reconstruction of a bridge over Oued Bourdim (PK33+350, RP6005) — Taourirt Equipment and Transport Directorate
· Construction
Geotechnical study for the reconstruction of the Oued Sidi Moussa bridge — Taourirt Equipment and Transport Directorate
· Construction