Design, Supply and Installation of 33 kV Distribution Lines and Associated Substations — Enhancing Sierra Leone Energy Access Project (ESLEAP)

Original title: Procurement of Design, Supply & Installation of 33 kV sub transmission lines and associated Substations to connect Fadugu to Kabala and Potoru to Pujehun to the Grid

Deadline

October 29, 2024

Closed
Published on September 17, 2024 at 12:00 AMModified on June 12, 2026 at 02:39 PM

Key information

Type
Energy
Location
Sierra Leone
Deadline
October 29, 2024 at 12:00 AMClosed
Estimated Value
Not disclosed
Language of Notice
English

What is this tender about?

Design, Supply and Installation of 33 kV Distribution Lines and Associated Substations — Enhancing Sierra... is an energy procurement opportunity published by Electricity Ditribution and Supply Authority in Sierra Leone on September 17, 2024. Submissions closed on October 29, 2024. 1 official document is attached below.

Specific Procurement Notice Request for Bids Plant Design, Supply and Installation of 33 kV distribution lines and associated Substations to connect Kabala and Pujehun distribution networks to the Grid (Two-envelope Bidding Process, Without Prequalification) Employer: Electricity Distribution and Supply Authority (EDSA) Project: Enhancing Sierra Leone Energy Access Project (ESLEAP) Project ID: P171059 Contract title: Design, Supply & Installation of 33 kV distribution lines and associated Substations to connect Kabala and Pujehun distribution networks to the Grid Country: Sierra Leone Grant No.: IDA-D7690 RFB No: SL-EDSA-442574-CW-RFB Issued on: 17th September 2024 1.

The Government of the Republic of Sierra Leone has received financing from the World Bank toward the cost of the Enhancing Sierra Leone Energy Access Project (ESLEAP), and intends to apply part of the proceeds toward payments under the Contracts for Design, Supply & Installation of 33 kV distribution lines and associated Substations to connect Kabala and Pujehun distribution networks to the Grid. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing, except for those payments, which the contract provides to be made through letter of credit.

  • The Electricity Distribution and Supply Authority (EDSA) now invites sealed Bids from eligible Bidders for: Lot 1: Design, Supply and Installation of 33 kV distribution line of about 36 km from 225/33 kV Fadugu substation to Kabala including substation at Kabala. • Approximately 36 km of 33kV distribution line (steel monopoles, double circuit structure, single circuit stringing, 265mm2 AAC conductor) • One 33/11kV, 15/20MVA Power Transformer • 33kV, 25kA for 3s, 630A Single Bus bars Air Insulated Switchgear (one feeder incomer cubicle, one transformer cubicle, one bus sectionalizer cubicle, one measuring cubicle) • Metering, protection and control • AC and DC supply • Power, auxiliary & control cables & accessories • Miscellaneous works (substation earth grid, outdoor lighting, substation lightening protection system, fire detection and protection system) • Construction of new 33kVswitchgear control building, equipment foundations, guard house, store and workshop, internal roads, storm drainage, mesh fence, septic tank and other associated civil works Lot 2: Design, Supply and Installation of 33 kV distribution line of about 43 km from Potoro (CLSG line) to Pujehun including substation at Pujehun. • Approximately 43 km of 33kV distribution line (steel monopoles, double circuit structure, single circuit stringing, 265mm2 AAC conductor) • One 33/11kV, 15/20MVA Power Transformer • 33kV, 25kA for 3s, 630A Single Bus bars Air Insulated Switchgear (one feeder incomer cubicle, one transformer cubicle, one bus sectionalizer cubicle, one measuring cubicle) • Metering, protection and control • AC and DC supply • Power, auxiliary & control cables & accessories • Miscellaneous works (substation earth grid, outdoor lighting, substation lightening protection system, fire detection and protection system) • Construction of new 33kVswitchgear control building, equipment foundations, guard house, store and workshop, internal roads, storm drainage, mesh fence, septic tank and other associated civil works 3.

Bidders may Bid for one or several contracts, as further defined in the bidding document. Bidders wishing to offer discounts in case they are awarded more than one contract will be allowed to do so provided those discounts are included in the Letter of Bid. 4.

Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations. 5. Interested eligible Bidders may obtain further information from Electricity Distribution and Supply Authority (EDSA), Mr.

Emmanuel Ozigbo (email: ozigboemmanu@gmail.com) and inspect the bidding document during office hours 09:00 to 17:00 hours at the address given below. 6. The bidding document in English may be purchased by interested eligible Bidders upon the submission of a written application to the address below and upon payment of a nonrefundable fee of 150.00 US$.

The method of payment will be by bank deposit into the ESLEAP Sub (Leones) Designated Account: Below are the Bank details: Name of Bank: SIERRA LEONE COMMERCIAL BANK Account Name: ENHANCING SIERRA LEONE ENERGY ACCESS PROJECT Account Number: 003001084275112142 BBAN: 003001084275112142 Corresponding Bank Details: Name of Bank: CITIBANK N.A (NEW YORK) Swift Code: BIC: CITIUS33 For the credit of: Sierra Leone Commercial Bank Limited SWIFT BIC: SLCBSLFR Account Number: 33445101 The document will be sent by e-mail.

  • Bids must be delivered to the address below on or before 29th October 2024, 12:00 noon. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked “ORIGINAL BID”, and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below on 29th October 2024, 12:15 p.m. (Conference room, 3rd Floor).

All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening. 8. All Bids must be accompanied by a Bid Security of: US$ 42,000.00 for Lot 1 And US$ 45,000.00 for Lot 2 9.

Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document. 10. The address(es) referred to above is (are): Electricity Distribution and Supply Authority (EDSA) Mr.

Emmanuel Ozigbo 4th Floor, 36 Siaka Stevens Street, Electricity House, Freetown, Sierra Leone E-mail: ozigboemmanu@gmail.com Cc: aleksandarnikolic@edsa.sl Cc: richardgoba@edsa.sl; gobarichard@gmail.com Cc: theophilusamara@edsa.sl Cc: eozigbo@edsa.sl

What are the key dates?

  1. Publication

    September 17, 2024

  2. Bid Submission Deadline

    October 29, 2024

  3. Evaluation & Award

    Pending

  4. Contract Signature

    Pending

Procuring Entity

Country
Sierra Leone
Contact person
Aleksandar Nikolic

Which documents are available?

Sign in to download the tender documents and be notified automatically of any change to this tender.