Angola
ocds-bidanga-AO-OP00460732
Substation Works for Interconnecting 220 kV Transmission Line
Original title: Substation Works for Interconnection of 220 kV Transmission Line
Deadline
September 21, 2026
Key information
- Type
- Energy
- Location
- Angola
- Deadline
- September 21, 2026 at 12:00 AM11 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Substation Works for Interconnecting 220 kV Transmission Line is an energy procurement opportunity published by National Transmission Uitlity (RNT) in Angola on August 5, 2026. Bids are open until September 21, 2026 (11 days left). 1 official document is attached below.
Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Two-envelope Bidding Process, Without Prequalification) Employer : RNT-Rede Nacional de Transporte de Energia, E.P. Project : Huíla-Cunene Interconnection Project (HCIP) Contract title : Plant Design, Supply, Installation and Commissioning for the Expansion of Cahama 400/220/60 kV Substation, Construction of the new Xangongo 220/60 kV Substation and Upgrade of the Existing Ondjiva 132/30 kV Substation to Ondjiva 220/132/60/30 kV Country : Republic of Angola Loan No. : 9886-AO RFB No : AO-RNT-525439-CW-RFB Issued on : August 05, 2026 1.
The Government of the Republic of Angola has received financing from the International Bank for Reconstruction and Development (IBRD) towards the cost of the Huíla-Cunene Interconnection Project (HCIP) and intends to apply part of the proceeds toward payments under the Plant Design, Supply, Installation and Commissioning for the Expansion of Cahama 400/220/60 kV Substation, Construction of the new Xangongo 220/60 kV Substation and Upgrade of the Existing Ondjiva 132/30 kV Substation to Ondjiva 220/132/60/30 kV.
For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing 2. RNT-Rede Nacional de Transporte de Energia, E.P. now invites sealed Bids from qualified bidders for Plant Design, Supply, Installation and Commissioning of substation works in Angola, for a period of two (2) years to be developed in this package: (i) Expansion of the Cahama 400/220/60 kV Substation, Construction of the new Xangongo 220/60 kV Substation and Upgrade of the Existing Ondjiva 132/30 kV Substation to Ondjiva 220/132/60/30 kV.
- Bidding will be conducted through international competitive procurement using Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers”, September, 2025 (“Procurement Regulations”), and is open to all qualified eligible Bidders. 4.
Bids will be evaluated in accordance with the evaluation process set out in the bidding documents. The following weightings apply for Rated Criteria (including technical and non-price factors): 70% and for Bid Cost: 30%. 5.
Interested eligible Bidders may obtain further information from the Huíla-Cunene Interconnection Project (HCIP), Project Implementation Unit and inspect the bidding document during office hours from Monday to Friday, 09:00 hours to 15:00 hours Angola local time, at the address given below. 6. The bidding document in English language may be obtained by interested eligible Bidders upon request to be sent to the email indicated below.
- Bids must be delivered to the address below to Huíla-Cunene Interconnection Project (HCIP), Project Implementation Unit on or before 10:00 hours Angola local time, by September 21, 2026. Electronic bidding will not be permitted.
Late Bids will be rejected. The outer Bid envelopes marked “ORIGINAL BID”, and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below.
All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening. 8. All Bids must be accompanied by a Bid-Securing Declaration as per the form provided.
- Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document. 10.
The address(es) referred to above is (are): Huíla-Cunene Interconnection Project (PIHC) Project Implementation Unit Gaveto entre a Estrada do Camama e Via Expressa, junto a Subestação Eléctrica do Camama, Luanda, Angola Mr. Mauro Hernany Ferreira Martins, PIU Coordinator Luanda – Angola Tel.: (+244) 222 704 400, (+244) 222 704 401 Electronic mail address: procurement_525439@pihc.ao
What are the key dates?
Publication
August 5, 2026
Bid Submission Deadline
September 21, 2026
11 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
- Country
- Angola
- Contact person
- Mauro Martins
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Build 220 kV Cahama-Xangongo-Ondjiva Transmission Line
Angola · Energy
Hiring an Environmental Specialist for the Njila Project — Republic of Angola
Angola · Energy
Contratação de um(a) Especialista Ambiental para a URIP1
Angola · Energy
Recruitment of Environmental Safeguards Specialist — Economic Diversification and Employment Creation Project, Republic of Angola
Angola · Energy
Recruitment of Environmental Safeguards Specialist for the TEST Project — Republic of Angola
Angola · Energy