Mozambique
ocds-bidanga-MZ-OP00476544
Supervision of Substructure Construction and Metallic Bridge Installation in Niassa — National Roads Administration of Mozambique
Original title: Supervision of the Construction of substructures and installation of Metallic bridges in Niassa province
Deadline
November 13, 2026
Key information
- Type
- Consulting & Studies
- Location
- Mozambique
- Deadline
- November 13, 2026 at 12:00 AM19 days remaining
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Supervision of Substructure Construction and Metallic Bridge Installation in Niassa — National Roads... is a consulting & studies procurement opportunity published by National Road Authority in Mozambique on October 22, 2026. Bids are open until November 13, 2026 (19 days left). 1 official document is attached below.
ADMINISTRAÇÃO NACIONAL DE ESTRADAS, IP Departamento de Aquisições REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Country: Mozambique Name of Project: Climate Resilient Roads for the North (CRRN - P500488) Grant No.: E315-MZ Assignment Title: Consultancy Services for Supervision of the Construction of Substructures and Installation of Metallic Bridges in Niassa province. Reference No: 47A003041/CP/32/2026 Client: National Road Administration, Administração Nacional de Estradas, Instituto Publico (ANE, IP) 1.
The Government of Mozambique (GOM) has received financing from the World Bank toward the cost of the Climate Resilient Roads for the North (CRRN), and intends to apply part of the proceeds for Consultancy Services for Supervision of the Construction of Substructures and Installation of Metallic Bridges in Niassa province hereafter designated the “Services”. 2. The project development objective is to improve climate-resilient road connectivity in the Northern provinces of Mozambique.
The construction and installation of the above-mentioned bridges will be implemented over a period of 10 months. The works are expected to be packaged in lots considering differences in their locations. 3.
The consulting services include but not limited to the following: a) Review of detailed engineering designs, construction drawings and quantities prepared by the Design Consultant. b) Supervision of the contractors works for construction of the substructures and installation of 12 metallic bridges in Niassa Province. c) Inspection, monitor defects correction and complete contract closure during Defects Notification Period for construction of substructures and installation of metallic bridges. 4. The detailed Terms of Reference (ToR) for the assignment can be obtained through the link: https://www.fe.gov.mz/storage/app/uploads/public/6ad/884/838/6ad88483806df291213449.pdf, or alternatively at the address below.
- The National Road Administration, Administração Nacional de Estradas, Instituto Público (ANE, IP) now invites eligible consulting firms (“Consultants”) to express their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.
- The evaluation of expressions of interest will be made on qualitative basis and the short-listing criteria are: a) General experience of the firm (must be at least 15 years) in the field of bridge design and supervision; b) Description of at least three (3) successfully completed similar projects involving construction supervision or design review of metallic bridges in the last ten years; c) Proved Technical and managerial capability of the firm; d) Experience of working in Sub Saharan Africa in the last 5 years is an added advantage; e) Experience in fragility, conflict, and violence affected countries is an added advantage; The CVs of the experts will not be evaluated at the shortlisting stage.
- The attention of interested Consultants is drawn to Section III, paragraphs, 3.13, 3.15, and 3.16 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2025 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest. 8.
Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. 11.
A Consultant will be selected in accordance with the Quality and Cost-Based Selection (QCBS) method set out in the Procurement Regulations. 12. Further information can be obtained at the address below during office hours, from 07:30 - 15:30 hours local time, Mondays to Fridays, except Public Holidays: 13.
Expressions of interest in English language, clearly marked RFP Nº 47A003041/CP/32/2026 “Consultancy Services for Supervision of the Construction of Substructures and Installation of Metallic Bridges in Niassa province” must be delivered in a written form to the address below (in person, by mail, or by e-mail) by 15:00 hours (local time), of November 13, 2026. | Client Street Address | : | Administração Nacional de Estradas (ANE) Gabinete do Director Geral Av. de Moçambique, Nº 1225, C.P. 403 | Attention | : | Mr.
Miguel Coanai – Deputy Director General | City | : | Maputo | Country | : | Mozambique | Telephone | : | +258 21 476 163 / 7 | Email | : | estradas.norte1@ane.gov.mz
What are the key dates?
Publication
October 22, 2026
Bid Submission Deadline
November 13, 2026
19 days remainingEvaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
- Country
- Mozambique
- Contact person
- Calado Ouana
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Supervision of Substructure Construction and Metallic Bridge Installation in Nampula — National Roads Administration
Mozambique · Consulting & Studies
Construction of Two Steel Bridges over Oued Chkouk — Tinghir Commune
· Construction
Construction of Nembo and Namakungwa Bridges — Zomba District Council
· Construction
Study for the construction of a bridge in Mechraa Bel Ksiri — Provincial Directorate of Equipment, Transport and Logistics of Sidi Kacem
· Construction
Project management services for the construction of a bridge at PK 913+800 — Zagora Provincial Directorate of Equipment
· Construction