🌍

ocds-bidanga-CM-OP00379283

completetender

Supply and Installation of Solar Street Lamps at Ballin — Government of Cameroon Program

Titre original : SW-MEME-AKWAYA-WORK-021 Supply and Installation of Solar Street lamps at Ballin, in Akwaya Council, Manyu Division, South-West Region

Deadline

October 15, 2025

Closed
Published on September 19, 2025 at 12:00 AMModified on June 12, 2026 at 11:29 AM

Key information

Type
Audit & Finance
Deadline
October 15, 2025 at 12:00 AMClosed
Estimated Value
Not disclosed
Language of Notice
English

Description

NOTICE OF THE REQUEST FOR QUOTATIONS

N°006/ RFQ/MAYOR/AC-ITB/PROLOG/2025 OF 16/09/2025 CONCERNING THE SUPPLY AND INSTALLATION OF SOLAR STREET LAMPS AT THE LOCALITY OF BALLIN IN AKWAYA COUNCIL, MANYU DIVISION, SOUTH-WEST REGION

Request for Quotation (RFQ)

  • The Government of Cameroon has received funding from the World Bank to finance the cost of the Local Governance and Resilient Communities Project (PROLOG). As part of its implementation, PROLOG has signed an agreement with AKWAYA COUNCIL (PROLOG COMMUNITY INVESTMENT SUPPORT GRANT AGREEMENT - AKWAYA COUNCIL, MANYU DIVISION, SOUTHWEST REGION) to build community infrastructure.
  • As part of the agreement, financing for the supply and installation of solar street lamps at the locality of BALLIN in Akwaya Council, Manyu Division, South-West Regionfor a period of execution of sixty (60) calendar days.
  • The Mayor of Akwaya Council now invites quotations from contractors for the Works described in Annex 1: Works Requirements, attached to this RFQ. As soon as the RFQ is published, the tender’s file will be made available to all bidders, either at their request to the Akwaya Concil (Employer) or the PROLOG PMU/RCU.

Fraud and Corruption

  • The Bank requires compliance with the Bank’s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework, as set forth in Appendix A to the Contract Conditions.
  • In further pursuance of this policy, Contractors shall permit and shall cause their agents (where declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit the Bank to inspect all accounts, records and other documents relating to the RFQ and Contract performance (in the case of award), and to have them audited by auditors appointed by the Bank.

Eligible Materials, Equipment and Services

  • The materials, equipment and services to be supplied under the Contract and financed by the Bank may have their origin in any country subject to Para. 9. At the Employer’s request, Contractors may be required to provide evidence of the origin of materials, equipment and services.

Eligible Contractors

  • In case the Contractor is a joint venture (JV), all members shall be jointly and severally liable for the execution of the entire Contract in accordance with the Contract terms. The JV shall nominate a representative who shall have the authority to conduct all business for and on behalf of any and all the members of the JV during the Request for Quotations process and, in the event the JV is awarded the Contract, during contract execution.
  • A Contractor may have the nationality of any country, subject to the restrictions pursuant to paras. 8 and 9 hereinafter. A Contractor shall be deemed to have the nationality of a country if the Contractor is constituted, incorporated or registered in, and operates in conformity with, the provisions of the laws of that country, as evidenced by its articles of incorporation (or equivalent documents of constitution or association) and its registration documents, as the case may be. This criterion also shall apply to the determination of the nationality of proposed subcontractors or subconsultants for any part of the Contract including Related Services.
  • Firms and individuals may be ineligible if so indicated in para.9 below and:

  • as a matter of law or official regulations, the Borrower’s country prohibits commercial relations with that country, provided that the Bank is satisfied that such exclusion does not preclude effective competition for the supply of goods or the contracting of works or services required; or
  • by an act of compliance with a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations, the Borrower’s country prohibits any import of goods or contracting of works or services from that country, or any payments to any country, person, or entity in that country.
  • In reference to paras. 5 and 7, for the information of Contractors, at the present time firms, goods and services from the following countries are excluded from this procurement process:
  • Under para. 5 and 8 (a): “none”.
  • Under para. 5 and 8 (b): “none”
  • A Contractor that has been sanctioned by the Bank, pursuant to the Bank’s Anti-Corruption Guidelines, in accordance with its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework as described in the appendix to the Contract Conditions (Appendix A) paragraph 2.2 d., shall be ineligible to submit Quotations or be awarded or otherwise benefit from a Bank-financed contract, financially or otherwise, during such period of time as the Bank shall have determined. A list of debarred firms and individuals is available on the Bank’s external website: http://www.worldbank.org/debarr.
  • Contractors that are state-owned enterprises or institutions in the Employer’s country may be eligible to compete and be awarded a Contract(s) only if they can establish, in a manner acceptable to the Bank, that they:

  • are legally and financially autonomous;
  • operate under commercial law; and
  • are not under supervision of the Employer.
  • A Contractor shall not have a conflict of interest. Any Contractor found to have a conflict of interest shall be disqualified. A Contractor may be considered to have a conflict of interest for the purpose of this Request for Quotations process, if the Contractor:

  • directly or indirectly controls, is controlled by or is under common control with another Contractor that submitted a Quotation;
  • receives or has received any direct or indirect subsidy from another Contractor that submitted a Quotation;
  • has the same legal representative as another Contractor that submitted a Quotation;
  • has a relationship with another Contractor that submitted a Quotation, directly or through common third parties, that puts it in a position to influence the Quotation of another Contractor, or influence the decisions of the Employer regarding this Request for Quotations process; or
  • or any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the works that are the subject of the Request for Quotations process; or
  • or any of its affiliates has been hired (or is proposed to be hired) by the Employer or Borrower for implementing the Contract; or
  • would be providing goods, works, or non-consulting services resulting from, or directly related to consulting services for the preparation or implementation of the project specified in this Request for Quotations, that it provided or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm; or
  • has a close business or family relationship with a professional staff of the Borrower (or of the project implementing agency, or of a recipient of a part of the loan) who: (i) are directly or indirectly involved in the preparation of the Request for Quotations or specifications and/or the evaluation of Quotations, of the subject Contract; or (ii) would be involved in the implementation or supervision of such Contract unless the conflict stemming from such relationship has been resolved in a manner acceptable to the Bank throughout the Request for Quotations process and execution of the Contract.

Performance Security (Not applicable)

  • The successful company must provide a Performance Bond in accordance with the terms of the contract

Validity of Quotations

  • The quotations shall be valid until ninety (90) days after opening the tenders

Price

  • The Contractor shall quote its total price in the Contractor’s Quotation Form.
  • The Contractor shall also fill in its rates and prices for all items of the Works described in the attached Bill of Quantities. Items against which no rate or price is entered by the Contractor will not be paid for by the Employer when executed and shall be deemed covered by the rates for other items and prices in the Bill of Quantities.

The rates and prices shall include all duties, taxes, and other levies payable by the Contractor under the Contract, as of the date 7 (seven) days prior to the deadline for submission of quotations

  • A Contractor expecting to incur expenditures in other currencies for inputs to the Works supplied from outside the Employer’s Country and wishing to be paid accordingly, shall indicate a foreign currency of its choice in addition to the local currency in CFA Francs XAF.
  • The currency(ies) of the Quotation and the currency(ies) of payments shall be the same.

Technical proposal

  • The Contractor shall furnish a technical proposal including a statement of work methods, equipment, personnel, schedule, and any other relevant information, in sufficient detail to demonstrate the adequacy of its proposal to meet the work’s requirements and the completion time.

Other: The Service Provider shall also produce an administrative file consisting of original documents or copies certified true by the issuing departments and consisting of the following valid items: (i) Trade Register; (ii) Certificate of tax compliance, (iii) Location plan signed on honor indicating the council of the tenderer; (iv) Certificate of non-bankruptcy; (v) Certificate of non-exclusion from public contracts; (vi) Tender certificate issued by the CNPS; (vii) Tax registration certificate; (viii) Bank domiciliation certificate; (ix) Site visit certificate and report signed on honor by the tenderer; (x) A Categorisation Certificate issued by the Authority in charge of Public Contracts (CIRCULER LETTER N 000006/LC/MINMAP/CAB OF 05/02/2025).

Note: It should be noted that the administrative documents mentioned above must be less than three (03) months old and be produced in originals or certified copies by the competent issuing authority. The absence of all or some of the above documents will not res

Tender Timeline

  1. Publication

    September 19, 2025

  2. Bid Submission Deadline

    October 15, 2025

  3. Evaluation & Award

    Pending

  4. Contract Signature

    Pending

Tender Documents

Connectez-vous pour télécharger le dossier et être averti automatiquement de toute modification de cet appel d'offres.