Mali
ocds-bidanga-ML-ML-DGMP-108642_AMI_347928
Update studies for construction of Boré-Korientzé-Aka track
Original title: Actualisation des études des travaux de Realisation de la piste Boré-Korientzé-Aka
Key information
- Type
- Consulting & Studies
- Location
- Mali
- Estimated Value
- Not disclosed
- Language of Notice
- English
What is this tender about?
Update studies for construction of Boré-Korientzé-Aka track is a consulting & studies procurement opportunity published by CONSEIL REGIONAL DE MOPTI in Mali on March 15, 2022. 1 official document is attached below.
Avis de marché public au Mali (DGMP-DSP). Type : Avis à manifestation d'intérêt. Autorité contractante : CONSEIL REGIONAL DE MOPTI. Date du dossier : 2022-03-15. Objet : Actualisation des études des travaux de Realisation de la piste Boré-Korientzé-Aka
What are the key dates?
Publication
March 15, 2022
Evaluation & Award
Pending
Contract Signature
Pending
Procuring Entity
Which documents are available?
Sign in to download the tender documents and be notified automatically of any change to this tender.
Similar tenders
Supply of transport services for the operation of the Kayes Regional Council
· Consulting & Studies
Elaboration of a Water Resources Management and Development Master Plan for the Upper Niger Basin — Ministry of Energy and Water, Mali
Mali · Consulting & Studies
Conduct of a set of studies in the social protection sector — UN Program
· Consulting & Studies
Conduct of a set of studies in the social protection sector — UN Program
· Consulting & Studies
Supply Building Materials for Four Projects
· Consulting & Studies