Design and Installation of Hybrid Solar Photovoltaic Plants for Health Facilities in South West State, Somalia — SESRP Project

Titre original : Design, Supply, Installation, Testing and Commissioning of Hybrid/Off-Grid Solar Photovoltaic Plant with Battery Energy Storage Systems for Health Facilities in SouthWest State of Somalia with 2 years of O&M Services with possibility of contract extension

Deadline

May 14, 2024

Closed
Published on March 28, 2024 at 12:00 AMModified on June 20, 2026 at 01:09 AM

Key information

Type
Énergie
Deadline
May 14, 2024 at 12:00 AMClosed
Estimated Value
Not disclosed
Language of Notice
English

Description

Request for Bids

Plant

Design, Supply Installation, Testing and Commissioning

(Two-envelope Bidding Process, Without Prequalification)

Employer:Ministry of Energy and Water Resources,Project:Somali Electricity Sector Recovery Project “SESRP”Contract title:Design, supply, installation, testing and commissioning of hybrid/off-grid solar photovoltaic plants with battery energy storage systems for 30 health facilities in South-West State of Somalia with 2 years of Operations and Maintenance (O&M) Services with the possibility of contract extension subject to availability of budget.Country:Federal Government of SomaliaGrant No.:D931-SORFB No:SO-MOEWR-405898-CW-RFBIssued on:28th March 2024 1. The Federal Government of Somalia has received financing from the World Bank toward the cost of the Somali Electricity Sector Recovery Project and intends to apply part of the proceeds toward payments under the Contracts for Design, supply, installation, testing and commissioning of hybrid/off-grid solar photovoltaic plants with battery energy storage systems for 30 health facilities in South West State of Somalia with 2 years of Operations and Maintenance (O&M) Services with the possibility of contract extension subject to availability of budget. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing except for those payments which the contract provides to be made through letter of credit. 2. The Ministry of Energy and Water Resources now invites sealed Bids from eligible Bidders for provision of design, supply, installation, testing and commissioning of hybrid/off-grid solar photovoltaic plants with battery energy storage systems for 30 health facilities in South-West State of Somalia with 2 years of Operations and Maintenance (O&M) Services with the possibility of contract extension subject to availability of budget as detailed in the table below. Table1: South-West State Facilities (30 facilities) – ScopeItem No.Location
Facility NameFacility TypeMinimum Total PV Capacity (kWp)Minimum Total PV Inverters Capacity (kWp)Minimum Total Battery Inverter/Chargers Capacity (kW)Minimum Total Battery Storage Capacity (kWh)1South -West StateBay Referral HospitalGeneral Hospital20420410011002South-West State
BAIDAO DISTRICT HOSPITALMaternity Hospital6060283203South-West StateSAHAL MOALIM ISSE HOSPITALMaternity Hospital6060283204South-West State
BAIDAO MENTAL HEALTHMaternity Hospital6060283205South-West StateMARKO HOSPITALMaternity Hospital6060283206South-West State
BARAWE HOSPITALMaternity Hospital6060283207South-West StateBUULO-JADID HCHealth Centre15157808South-West State
SUUQA XOOLAHA HCHealth Centre15157809South-West StateBULOW HCHealth Centre151578010South-West State
MORAGABEY HCHealth Centre151578011South-West StateMARDO HCHealth Centre151578012South-West State
SHIIDLE HCHealth Centre151578013South-West StateMOH OFFICESHealth Centre151578014South-West State
ELBERDE HCHealth Centre151578015South-West StateWAJID HCHealth Centre151578016South-West State
WADAJIR HCHealth Centre151578017South-West StateWASHAGO HCHealth Centre151578018South-West State
BISHA CAS HCHealth Centre151578019South-West StateHAKABA HCHealth Centre151578020South-West State
WABERI HC (B/Hakaba)Health Centre151578021South-West StateQANSAH DHERE HCHealth Centre151578022South-West State
AFGOYE HCHealth Centre151578023South-West StateDOLOW HCHealth Centre151578024South-West State
WABERI HC (Barawe)Health Centre151578025South-West StateAYUB HCHealth Centre151578026South-West State
MALABLE HCHealth Centre151578027South-West StateWANLAWEYN HCHealth Centre151578028South-West State
QORYOLEY HCHealth Centre151578029South-West StateAFGOYE HospitalHealth Centre151578030South-West State
BERDALE HCHealth Centre1515780

The project’s delivery period is 8 months from the effective date.

Solar Hybrid Inverters are acceptable in place of separate PV Inverter and Battery Inverter/Chargers. They, however, must simultaneously meet the specifications and performance requirements of both the PV Inverters and Battery Inverter/Chargers as prescribed in Section VII- Employers requirements.

  • Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated September 2023 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations.
  • Interested eligible Bidders may obtain further information from the Interim Project Coordinator, Project Implementation Unit, Ministry of Energy and Water Resources, email address: [email protected] and inspect the bidding document during office hours from 8.30am to 4.00pm at the address given below.
  • The bidding document in English may be obtained free of charge by interested eligible Bidders in the link https://sesrp.moewr.gov.so/company-overview/careers/ on the website sesrp.moewr.gov.so or can be provided upon submission of a written application to the address below.
  • A Pre-bid conference shall be conducted by the Employer at the PIU Office, Ministry of Energy and Water Resources, Mogadishu, Somalia on 25th April 2024 at 10.30am Mogadishu Local Time. No site visits shall be organized by the employer and site visits are optional, but bidders are encouraged to make site visits to sample sites for General Hospitals, Maternity Hospitals and Health Centers to familiarize themselves fully with the scope of work envisaged.
  • Bids must be delivered to the address below on or before 10.30 am on 14th May 2024. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked “ORIGINAL BID”, and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below, at 11.00 am on 14th May 2024. All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in the safe custody of the Employer until the second public Bid opening.
  • All Bids must be accompanied by a Bid-Securing Declaration using the form included in Section IV, Bidding Forms.
  • Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.
  • The address(es) referred to above is (are):

Interim Project Coordinator,

Project Implementation Unit “PIU” Office,

Somali Electricity Sector Recovery Project, 6th Block, 2nd Floor,

Ministry of Energy and Water Resources,

Airport Road, next to Ali Jim’ale Mosque,

Waberi District, Mogadishu, Somalia,

Tel Number: +252 770 980 456,

Website: sesrp.moewr.gov.so

Tender Timeline

  1. Publication

    March 28, 2024

  2. Bid Submission Deadline

    May 14, 2024

  3. Evaluation & Award

    Pending

  4. Contract Signature

    Pending