🇸🇴

Somalia

ocds-bidanga-SO-OP00337019

activetender

Construction of Garowe Storm Water Drainage Package 3 (Lot 2 - Part 1) Garowe Municipality, Puntaland, Somalia

Deadline

March 4, 2025

Closed
Published on February 23, 2025 at 12:00 AMModified on June 12, 2026 at 02:39 PM

Key information

Type
Construction
Procuring Entity
Garowe Municipality
Location
🇸🇴 Somalia
Deadline
March 4, 2025 at 12:00 AMClosed
Estimated Value
Not disclosed
Language of Notice
English

Description

Somalia Urban Resilience Project Phase Two (SURP-II)

Nagaad

Specific Procurement Notice

Request for Bids

(One-Envelope Bidding Process)

Country: Federal Republic of Somalia

Name of Project: Somalia Urban Resilience Project Phase Two (SURP-II)

Contract Title: Construction of Garowe Storm Water Drainage Package 1 (Lot 2 - Part 1) Garowe Municipality, Puntaland, Somalia

RFB Reference No.: SO-GM-471047-CW-RFB

Date RFB Issued: February 3rd 2025.

  • The Federal Government of Somalia has received financing from the World Bank toward the cost of the Somalia Urban Resilience Project- Phase II (SURP-II), and intends to apply part of the proceeds toward payments under the contract for Construction of Garowe Storm Water Drainage Package 1 (Lot 2 - Part 1) Garowe Municipality, Puntaland, Somalia. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.
  • The Garowe Municipality Project Implementation Unit now invites sealed Bids from eligible Bidders for Construction of Garowe Storm Water drainage Package 1 (Lot 2 - Part 1) Garowe Municipality, Puntaland, Somalia).

3.The scope of the works include.

#DESCRIPTIONU.M.QUANTITY
1Site clearance and soil excavation along the road for trunk barrels layingm338,319.02
2Construction of hydraulic reinforced concrete trunk barrels buried line along the road for stormwater drainage, including storm drainage manholes and outlet clapet valvem1,793.50
3Construction of reinforced concrete cast in situ manholes junctions and outletm3101.98
4Wadi Outlets Nature-Based Solutions gabions constructionm31,005.70
5Backfilling of the trunk barrelsm319,610.87
6Cut and restore road surface and creation of sidewalksm218,265.80The construction period will be 15 months and a Defects Liability Period of Twelve (12) months.4.Bidding will be conducted through open national competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated July 1st, 2016, revised November 2017, August 2018, November 2020 and September 2023 (“Procurement Regulations”), and is open to all Bidders as defined in the Procurement Regulations.SURP-II CoordinatorProject Implementation Unit ofGarowe Municipality, Puntland, SomaliaEmail address: [email protected] andCopy [email protected]and inspect the bidding document during office 0900 HRS to 1500 HRS from Saturday to Thursday at the address given below.5.The bidding document in English may be purchased by interested eligible Bidders upon the submission of a written application to the address below and upon payment of a nonrefundable fee of One Hundred and Fifty US Dollars Only (USD 150). The method of payment will be: The method of payment will be direct deposit in the following Dahabshiil account#: GRWD000850 with the description of “Cost of bidding documents for SURPII Construction of Garowe Storm Water drainage Package 1 (Lot 2 - Part 1) Garowe Municipality, Puntaland, Somalia).6. Once the payment is received, the document will either be sent by email (PDF version) COURIER at the cost of the bidder or PICKED-UP at the PIU Office, Municipality of Garowe.7. A virtual pre-bid meeting shall be conducted by the Employer on .to be updated February 17th 2025, at 10.00 HRS Mogadishu Time at PIU office, Garowe, Somalia.8.Bids must be delivered to the address below on or before March 4th 2025. Electronic Bidding will be permitted. Bids submitted after the deadline will be rejected and submitted bids whose password not received on specified deadline will not be opened and will be rejected and returned to the bidders unopened.9.Bids will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend at the address below on March 4th 2025 at 10.00 HRS East African time.10.All Bids must be accompanied by a Bid-Securing Declaration using the form included in Section IV, Bidding Forms.11.Your attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.12.The address(es) referred to above is:Garowe Municipality,Garowe Main Road- Garowe Municipality Office(Former Puntland State House).Project Implementation Unit, Garowe Municipality.Email: [email protected]Garowe Municipaliy Puntlnad, Somalia

Tender Timeline

  1. Publication

    February 23, 2025

  2. Bid Submission Deadline

    March 4, 2025

  3. Evaluation & Award

    Pending

  4. Contract Signature

    Pending

Procuring Entity

Procuring Entity
Garowe Municipality
Country
Somalia
Contact person
Mohamed Abdirahman Gure

Tender Documents